I’ve lost track of the days on the build, but they’re still making progress.
Out side we have a big pile of wood (which was tidied up by Monday night). It appears to be mostly the frame of the roof from the kitchen.
The lightwell in the en-suite has been framed, although the window isn’t in yet. It’s a touch larger than I imagined, and takes up about a third of the total roof space, we’ll be able to bathe by moonlight.
The old tiles went on the back of the house, as you can see above.
The printouts I gave the builders with markings for where we wanted lights and the switches has been transferred to the new bedroom, mostly by use of a bit of chalk. They’ve put the boxes in for the socket, including one half way up the wall for a TV when we get that far; do need to figure out how we get the Sky scart signal to it and some other bits of wire that I’d forgotten about.




One Comment
That rings a bell. Re-jigging electrical items was the cause of most of the cost over-runs I had.
I don’t envy you the next few weeks as the house is taken apart around you!